Ravenvalor
Senior Member
- Location
- Piedmont region of NC
Hello,
I looked at a residential service last week that had the meter base about 25' from the service panel in the basement. It was feeding the service panel with 3 - 4/0 aluminum conductors in 2" pvc run on the outside of the home. it had a ground rod at the meterbase and a ground rod at the service panel. A number 6 solid copper conductor was running from the service panel, to the first ground rod then to the next ground rod and then to the meterbase. Considering that there is already a 4/0 conductor connecting the meter base to the service panel would one consider this a ground loop? If so is it a code violation or possibly a hazard?
Thank you,
I looked at a residential service last week that had the meter base about 25' from the service panel in the basement. It was feeding the service panel with 3 - 4/0 aluminum conductors in 2" pvc run on the outside of the home. it had a ground rod at the meterbase and a ground rod at the service panel. A number 6 solid copper conductor was running from the service panel, to the first ground rod then to the next ground rod and then to the meterbase. Considering that there is already a 4/0 conductor connecting the meter base to the service panel would one consider this a ground loop? If so is it a code violation or possibly a hazard?
Thank you,