Ground ring installation

Status
Not open for further replies.

mikhen

Member
Location
oley, pa
I understand the ground ring and terminating to the panel. The job I'm on right now requires 5 ground rods, the rebar mesh, at 5 columns, all bonded to the ground ring at each point with cadwelds. So if I'm right, I need a weld to the mesh, a weld to the steel column, a weld to the ground rod, and a weld to the ring. All connected together. That's 6 welds at each rod/ column location? Does that sound right?
 
I understand the ground ring and terminating to the panel. The job I'm on right now requires 5 ground rods, the rebar mesh, at 5 columns, all bonded to the ground ring at each point with cadwelds. So if I'm right, I need a weld to the mesh, a weld to the steel column, a weld to the ground rod, and a weld to the ring. All connected together. That's 6 welds at each rod/ column location? Does that sound right?
Depends on their physical location with respect to each other and what cadweld form you use... but you're probably looking at least three per column.
 
Depends on their physical location with respect to each other and what cadweld form you use... but you're probably looking at least three per column.


We have the 2/0 to rod mold and the 2/0 to 2/0 tap mold I was hoping for different molds but this is what the boss got me
 