Isn't that the same as any time a ground rod is driven? There's always a wired pathway, but if it is required by code, it is required. Places I work require redundant and/or additional grounds, not code specs. but client specified.
What is the point of driving a ground rod at a seperate building when a Ground wire is already pulled with the feeder to it?
Is a ground rod required at every seperate building regardless of wether it is a feeder or Branch circuit brought to it?
and why is that?
what changes?