transman2
Senior Member
- Location
- Brooklet,Ga.
Is it required to install a ground rod at a lift station control panel if 3 phase power is run from one panel at a building/structure then underground to a new lift station control panel. A grounding conductor is run with the power circuits but for some reason I'm thinking that if its more than one circuit or could be considered another structure that a ground rod would be required there also. I hope I explained this ok. Thanks for any and all help.