I'm estimating a large hotel project and the engineer shows a grounding system in the building with 3 ground rod delta config. at about 10 different locations outside around the building all tied together with 250MCM cable. This is not a lightning protection system but a grounding system for all the electrical rooms and the two 15 story towers. First of all is the legal by code and isn't this OVERKILL!