ground rods

Status
Not open for further replies.

kjless

Member
Location
plaistow nh
i have a 325A service. the meter is out side and the main disco is inside the building. seeing as how the main disco is in side can i just bring my #6 from my ground rods and my ground from building steel/water main to that location. so the only ground going to the meter is my equip ground.
 
i have a 325A service. the meter is out side and the main disco is inside the building. seeing as how the main disco is in side can i just bring my #6 from my ground rods and my ground from building steel/water main to that location. so the only ground going to the meter is my equip ground.

Wouldn't the meter be inherently bonded to POCO's grounded conductor during manufacturing?
 