Volt-Amps
Member
- Location
- Indianapolis
I'm reviewing a drawing where there is a main service disconnect for the building, the main disconnect is connected to a meter section with 5 meters, one for house panel and 4 are for dwelling units above. I noticed that they are showing 3 conductors from each meter to the tenant panel, no mention of ground. I know EMT can be used as equipment ground if certain requirements are met, but I'm confused if ground wire is required from the meter to the tenant panel. Can someone help clarify please?