francis.key19
Member
- Location
- frederick, md
Hi,
Has anyone here ever work in a plant where there are both grounded and ungrounded 480VAC distribution systems in the same building and what variety of issues experienced (if any other than troubleshooting, training and labeling).?
Thanks in advance.
FK19
Has anyone here ever work in a plant where there are both grounded and ungrounded 480VAC distribution systems in the same building and what variety of issues experienced (if any other than troubleshooting, training and labeling).?
Thanks in advance.
FK19