we are installing some equipement for communication equipment and it requires grounding. The room is on 3rd floor with no building steel. There is
XFMR in the room, on 3rd floor, has a 3/4'' conduit with #6 for ground rod running to 1st floor. is there a reason, by Code, i couldnt run a #2 to a ground bus bar
and use that for XFMR grounding or cellulr equipment.
XFMR in the room, on 3rd floor, has a 3/4'' conduit with #6 for ground rod running to 1st floor. is there a reason, by Code, i couldnt run a #2 to a ground bus bar
and use that for XFMR grounding or cellulr equipment.