Tlogix
Member
- Location
- Fordville ND USA
I have a Meeter then a Main disconnect about 300 feet from the building its feeding. I have a main panel inside the building 4 wires running from the disconnect to the main 3 hot one neutral.
I have ground rods at both, main disconnect and main panel.
Can I just bond the neutral to the ground at the main panel?
Or do I need to run a ground wire between the 2 panels?
Example:
Five wires three hot one neutral one ground.
120/208
I have ground rods at both, main disconnect and main panel.
Can I just bond the neutral to the ground at the main panel?
Or do I need to run a ground wire between the 2 panels?
Example:
Five wires three hot one neutral one ground.
120/208