LITTLE CONFUSED WITH THIS ISSUE. HAVE A 600A-208 VOLT MDP. FROM THIS MDP I AM EXTENDING (3) FEEDERS.
FEEDERS:
1. 3 PHASE, 208V, 200 AMP, WYE
2. 3 PHASE, 208V, 200 AMP, WYE
3. SINGLE PHASE, 208V, 200 AMP,WYE
THESE FEEDERS WILL SERVE THREE NEW PANELBOARDS. FEEDERS SHALL ENTER THE BOTTOM OF EACH PANELBOARD. AT THE TOP OF EACH PANELBOARD AND CONNECTED TO EACH IS A 6"X6" WIREWAY. FROM THAT WIREWAY I AM EXTENDING SEVERAL 2-1/2" EMT CONDUITS TO ANOTHER WIREWAY (24"TOTAL LENGTH) FOR RELOCATING BRANCH CIRCUITS IN A ATTIC. WHAT IS THE PROPER WAY TO GROUND AND BOND THE EQUIPMENT?
FEEDERS:
1. 3 PHASE, 208V, 200 AMP, WYE
2. 3 PHASE, 208V, 200 AMP, WYE
3. SINGLE PHASE, 208V, 200 AMP,WYE
THESE FEEDERS WILL SERVE THREE NEW PANELBOARDS. FEEDERS SHALL ENTER THE BOTTOM OF EACH PANELBOARD. AT THE TOP OF EACH PANELBOARD AND CONNECTED TO EACH IS A 6"X6" WIREWAY. FROM THAT WIREWAY I AM EXTENDING SEVERAL 2-1/2" EMT CONDUITS TO ANOTHER WIREWAY (24"TOTAL LENGTH) FOR RELOCATING BRANCH CIRCUITS IN A ATTIC. WHAT IS THE PROPER WAY TO GROUND AND BOND THE EQUIPMENT?