Oldmaster2
Member
- Location
- PA
- Occupation
- Master Electrician
When using 2 ground rods I always run the GEC through the first clamp and terminate at second rod. Always continuous from panel to ground rods. I'm told that it is permissible to run to the first rod and install a jumper to second rod. My inspector says no, that's not continuous. Appreciate your thoughts.