We are working on a new bldg that will attach to an existing bldg...At this point the inspector says it is one building....The water service will come overhead from the existing building....Do we have to take the GEC all the way back to the existing water service( which would cause extensive damage ) or is it possible to just hit building steel on the existing bldg?