We just started a new 20,000 sq ft 2 story bank.
The Engineer has a detail showing how they want the ground rods to be installed.
They are requiring to install 3/4" ground rods at three locations 30 feet apart with 30 feet of rod at each location. They also want the system tested using a fall of potential test to prove 5 ohms of resistance.
We sent an RFI to them asking why they have detailed this installation this way. Answer was this is the only way to acheive 5 ohms.
I have never come across this before......I am pretty sure 5 ohms can be reached without the overkill......?????
Is this really necessary?
The Engineer has a detail showing how they want the ground rods to be installed.
They are requiring to install 3/4" ground rods at three locations 30 feet apart with 30 feet of rod at each location. They also want the system tested using a fall of potential test to prove 5 ohms of resistance.
We sent an RFI to them asking why they have detailed this installation this way. Answer was this is the only way to acheive 5 ohms.
I have never come across this before......I am pretty sure 5 ohms can be reached without the overkill......?????
Is this really necessary?