Hello All,
I'm working on wiring up a restaurant (building built in 60's or 70's) remodel that has an existing 600 AmpZinsco service. 5 feet away from that main service there was ("was" because the plumbers relocated it) a 2" water pipe that stubbed out from which there was a 1" conduit carrying a wire that bonded to that pipe. Is that the main grounding method? Should I just bond it again to the nearest location or should I run all the way to the water main? What is code for grounding this service? Is there usually a ufer hiding under the panel somewhere?
Sorry for all the questions! And thanks for all the help.
Thanks
I'm working on wiring up a restaurant (building built in 60's or 70's) remodel that has an existing 600 AmpZinsco service. 5 feet away from that main service there was ("was" because the plumbers relocated it) a 2" water pipe that stubbed out from which there was a 1" conduit carrying a wire that bonded to that pipe. Is that the main grounding method? Should I just bond it again to the nearest location or should I run all the way to the water main? What is code for grounding this service? Is there usually a ufer hiding under the panel somewhere?
Sorry for all the questions! And thanks for all the help.
Thanks