Have 400 amp/1 phase service disconnect outside of building . Inside feeds to automatic transfer switch from generator and to sub panel.this was pre-wired to a 200 sub panel from factory in transfer switch a ground wire was tied into the neutral bar in transfer cabinet. there is a ground bar with equipment grounds. do not think this should be tied into neutral. to me it the same as the sub panel where we do not tie neutral and equipment grounds together.Is this done so breakers can see short circuit current with when in under generator mod?