I'm working on a project with two separate, adjacent buildings. A generator is going on the roof of one building to serve the other building. The generator will be configured as a separately derived system, and therefore requires a grounding electrode connection. I assume this connection should be made to a grounding electrode in the building SERVED by the generator, but the NEC doesn't address this issue directly (that I can find). I think it makes sense to tie the two buildings' grounding electrode systems together. Any different interpretations or thoughts?