How do you figure how much grounding you do to a building if the building is 100x300ft. Would it be correct if the contractor installs 1 ground rod for each corner (4 total ) and tie to the rebar. Install 3 outside of the indoor panel, ground the coldwater pipe coming in the building and the roof structure and all will be tied together. There is no ground ring installed, the contractor believes the rebar would be fine and act as the ring. This seems very minimal to me and I believe there should be much more grounding done with a building this size. If I'm wrong I'm wrong but if I'm right how do I recommend and design how much grounding I need to be sufficent. Need your help.