sfav8r
Senior Member
- Location
- San Francisco Bay Area
I need to run 6 circuits to a kitchen that is being remodeled. Rather than run 6 runs of 12/2 MC, I'd like to run all the circuits in one larger MC to a junction box (approx 50 feet from the panel) then continue from the junction box with NMC.
I would run a single ground in the MC and tie it to the 6 grounds coming from the individual circuits.
Any problem with this?
Thanks for your input.
I would run a single ground in the MC and tie it to the 6 grounds coming from the individual circuits.
Any problem with this?
Thanks for your input.