Grounding MV Subs

Status
Not open for further replies.

Electriman

Senior Member
Location
TX
Greetings,

I am working on a project that two 15 kV substation(A and B) separately fed from different sources. The project scope is to disconnect the existing Sub B feeder and feed from Sub A.
Currently these two subs have two independent ground grid. I was wondering what I have to do for their ground grid. Please support your idea with NEC/NESC standard.

Thank you in advance.
 
Do you not have a set of engineered drawings for this work? Too serious a question to leave to a forum response.

I am going to develop some drawings but for now I would like to see what different codes require since grounding is somewhat controversy between various codes.
 
Status
Not open for further replies.
Top