Hi,
We have a big warehouse (20,000 Sq meter) where government electricity is split into 4 different feeders in 4 different locations, To provide electricity to the warehouse we have 4 MDB for each feeder.
The connection between feeder and MDB will be double runs in parallel of 600 MCM [2(4Cx300mm^2)]. and a ground cable of 300 MCM (1Cx150mm^2).
Now my question is DO we have to use 2 runs of ground cable or one ground cable is enough?