jay pai1
Member
- Location
- El Dorado, KS, USA
We have a project to bring underground piping above the ground. Plan is to support the pipes every 20' via concrete piers with rebar cage. Top of the pier will be 6" above grade, product inside these pipes are not water.
Is there a need to ground the piers (between rebar cage and the support that pipe will sit on)? The literature that I have read pertains to grounding only pipes that contain water.
Is there a need to ground the piers (between rebar cage and the support that pipe will sit on)? The literature that I have read pertains to grounding only pipes that contain water.