Super Rich
Member
- Location
- Chicago Il. USA
I want to know if is necessary or advised to run a bldg. ground wire to a subtractive utility meter for a new tennant panel fed from a metered distribution panel in a Chicago high rise bldg.?
Super Rich
Super Rich