Hello Everyone:
The customer planning on using a generator (800KW) to back up the entire facility via ATS-4 Poles. The generator is about 400ft from the building its serving and a concrete pad will be provided. Would providing a ground ring buried 24" around the pad with ground rods at each corner of the pad will be adequate to meet the NEC intent for grounding electrode?
The customer is planning on renting a portable generator (before buying the permanent Gen set), are the portable generator (800KW) normally are separately derive system (SPD)?
Thanks,
The customer planning on using a generator (800KW) to back up the entire facility via ATS-4 Poles. The generator is about 400ft from the building its serving and a concrete pad will be provided. Would providing a ground ring buried 24" around the pad with ground rods at each corner of the pad will be adequate to meet the NEC intent for grounding electrode?
The customer is planning on renting a portable generator (before buying the permanent Gen set), are the portable generator (800KW) normally are separately derive system (SPD)?
Thanks,