ecirplr
Member
- Location
- Austin, TX
I have been wondering and cannot find it in the NEC about the requirements for bonding the case of a transformer. In times past we were instructed to drill a hole, scrape the paint off the case so the lug will make contact with it. If you are required to use the threaded hole in a 1900 box why shouldn't it also be required to have a treaded stud or tapped hole for a transformer. I recalled reading here last week that it now stipulates the # of threads that are required for grounding/bonding in the 1008 NEC. Just a thought.