I have a 100 amp 3 phase panel fed from a manhole with a ground rod It is fed with 4-5 so cord.The neturals & grounds are separated.The ground wire is kearned at the manhole it has a pigtail going to the ground rod & then to the frame of the concession stand whitch will be there 17 days when the fair is over.Now the inspector wants to run another ground wire from the ground bar to the rod then to the frame & take thejumper to the rod out. Isn't this redundant grounding since the presant ground wire is already there.