Im currently instaling a 1200amp 3-phase 120/240 volt service and cannot get 2 of the same opions on how to ground and bond this situation.Here's what i have,1200 amp disconect connected to 8 125amp meter stacks where the ground and neutral are isolated from each other,then onto a splice box,from there to a ct cabinet and finally nippled in to our 400amp subpanel.Now the problem is in the meter stacks they have 3phases and a neutral bar W/ no EG for the CT & Sub-panel. Whats the best way to install this thanks.