Groung wire requirements?

Status
Not open for further replies.
Where does it address the requirement for a ground wire between the service disconnect (located on building) and the panel (located inside building) in the NEC? Thanks in advance!!!!
 
ALLELECTRIC95 said:
Where does it address the requirement for a ground wire between the service disconnect (located on building) and the panel (located inside building) in the NEC? Thanks in advance!!!!

250.122 :)
 
Status
Not open for further replies.
Top