Where does it address the requirement for a ground wire between the service disconnect (located on building) and the panel (located inside building) in the NEC? Thanks in advance!!!!
Where does it address the requirement for a ground wire between the service disconnect (located on building) and the panel (located inside building) in the NEC? Thanks in advance!!!!