I've got a job where due to physical outdoor space I need to install an additional main breaker load center inside the house.
Current exterior set up is meter base with Service rated ATS directly next to it.
Increased load will require a second load center be installed indoors in the basement directly behind the meter base.
I'm working under the 2015 IRC and don't see anywhere in there where the disconnects require being grouped.
Would this install be code compliant?
Current exterior set up is meter base with Service rated ATS directly next to it.
Increased load will require a second load center be installed indoors in the basement directly behind the meter base.
I'm working under the 2015 IRC and don't see anywhere in there where the disconnects require being grouped.
Would this install be code compliant?