I have a customer that fills propane bottles inside their facility. From what I can find in NEC 2011 code classifies the entire area as Class 1 Division 2. However my customer says they abide by NFPA-72 and that only requires a 15' radius around the fill nozzle be classified and the rest of the building is standard wiring method. Does anyone else have a better understanding of this? My concern is the existing wiring outside the 15' radius is EMT, SS fittings and open faced receptacles