I was one a job where we ran about 500 ft of heat trace wire, i wasnt the one that ran the wire so im not sure what kind of wire it was or if it was some sort of cable. The wire was run along the pipeline and ran over top of a
U bolt. We were told we had to take all of it down and run it through the U bolt because of induction. I think we were supposed to let it run through the U bolt but not let it touch the U bolt, but im not sure. Can anybody explain this?