hambone1216
Member
- Location
- Rochester new york
I work in the Rochester NY area, and the local power company, is requesting that i place the high leg on the outside set of lugs (c phase)in the CT cabinet for metering purposes. Then code requires that i place the high leg on B phase in the panel.
My problem is that some of the panels that will be fed from my new service have the high leg on C phase. Do the sub panels all have to be changed to having the B phase as the high leg. Or does the main service only fall in the category of B phase only for high leg?
My problem is that some of the panels that will be fed from my new service have the high leg on C phase. Do the sub panels all have to be changed to having the B phase as the high leg. Or does the main service only fall in the category of B phase only for high leg?