buddhakii
Senior Member
- Location
- Littleton, CO
I always thought the high leg of a delta service was required to be terminated on B phase excluding the meter socket but I cannot find the code reference. Just got done terminating the panels and went to put the covers on and noticed the sticker on the dead front says A phase high leg. If I'm wrong about the requirement of high leg on B phase looks like I'm gonna have to re-phase everything.