wwhitney
Senior Member
- Location
- Berkeley, CA
- Occupation
- Retired
Does Square D make a hold-down for a double pole QO breaker in an arbitrary location? As far as I can tell from the catalog, they only offer them for the upper right location.
If not, is there a generic alternative that can be used? With two double pole breakers left-right does putting a long cable tie around both breaker bodies really work?
This is for a system with PV and ESS and an MID; my understanding that the ESS interconnect breakers require a hold-down. Certainly if the ESS is operating in off-grid mode and you pop one of the ESS interconnect breakers off the bus, the bus terminals will be live unless the breaker is off.
Thanks,
Wayne
If not, is there a generic alternative that can be used? With two double pole breakers left-right does putting a long cable tie around both breaker bodies really work?
This is for a system with PV and ESS and an MID; my understanding that the ESS interconnect breakers require a hold-down. Certainly if the ESS is operating in off-grid mode and you pop one of the ESS interconnect breakers off the bus, the bus terminals will be live unless the breaker is off.
Thanks,
Wayne
