Greetings,
When we power an ADU which is separated from the main building, per NEC code do we need to have a new grounding electrode next to the ADU and bond the rebars and water metal pipes per NEC if we use the existing service but we put a new subpanel in the ADU?
Thanks for feedback.
When we power an ADU which is separated from the main building, per NEC code do we need to have a new grounding electrode next to the ADU and bond the rebars and water metal pipes per NEC if we use the existing service but we put a new subpanel in the ADU?
Thanks for feedback.