What are the wiring changes needed to existing loadcenters when installing Automatic Transfer Sw to line side of loadcenters and load side of ATS as far as grounding or bonding?
Also at the generator, what type of grounding/bonding does the code require at that location?
Also at the generator, what type of grounding/bonding does the code require at that location?