Ok I am hooking up a Solar job doing a line tap on the line side of a main disconnect. I have a 4/0 225 amp copper feed (not parallel) that I need to Tie in to Line the line side of a 400 amp service disconnect. Feeding this disconnect is 2 Parallel 4/0 conductors. I want to put a triple bug on my 4/0 and jump off with 2- 1/0 parallel conductors and use bite-down connectors to attach these parallel conductors to the 4/0 parallel conductors feeding this disconnect. it will save me a disconnect reconnect not hold up job for 3 weeks and basically save my life.