Serving a healthcare facility from a generator source for the essential electrical system power (life/safety, critical and equipment).
Can the distribution breakers, to serve ATS's, be installed in a panelboard or switchboard without separation between the distribution circuit breakers or wiring?
OR
Are they required to be separated from each other per NEC 700.10 ?
Can the distribution breakers, to serve ATS's, be installed in a panelboard or switchboard without separation between the distribution circuit breakers or wiring?