PrimaryElectric
Member
We have new hospital with a 500A Main in MDP. EE shows Ground Fault protection for the MDP on the riser which would required all breakers in the panel to be GF. GF protection is not required unless the main breaker is over 1000A right? EE does not show GF on the schedule for MDP nor is it in the coordination study. This is a $15K items so of course we do not want to provide GFI if it is not necessary.