how long for 45 unit IR test on panels

AC\DC

Senior Member
Location
Florence,Oregon,Lane
Occupation
EC
they want me to do a IR on all there panels in the units. Figuring once I get on site and set up I can roll through alot of them, writing up each unit is going to take longer.
Was thinking $450 a unit?
have not don't this before. Plan on loading panels up and then taking picture after 15-20 minutes of extended use. Don't need anything fancy Just turn heat, stove dryer.
First 5 are going to take me the longest then a grove will form.. What would you think is a good amount. Still got to find a Good tester. Thinking about a 1-2 k tester
 