I purchased an old farm property and am have been going over what would be the best approach to tackle this job. The house has been in use by myself only for over a year with no issues (fires) yet and it is wired for 100A service/#2 wire. I don't want to push my luck so I am going to work on the replacing the basement panel (which has had moisture issues, thus all the rust), but my main concern is how they had this wired. Am I ok to replicate the double tap on the main lugs in the basement seen in picture #2 or is that a no no?

My new panel only has lugs big enough for 1 wire on each leg, so I technically cannot fit two #2 wires like it is currently. Am I ok to install the 'staircase' double lug to run the wires upstairs or is there a better way?

Also, is the upstairs panel 'technically' a sub panel or remote panel?

Please share any other concerns/comments/code violations as well so I can address these issues.

Sorry it won't let me embed, image links below

Layout

Pic 1 Disconnect 100A

Pic 2 Main Lug

Pic 3 Upstairs Panel
 
I am closing this thread, in accordance with the Forum Rules.
This site is designed for:
  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals
* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain. Reminder to all members, if you see a questionable post, feel free to report it by clicking "Report" at the bottom left corner of the post.
 
Status
Not open for further replies.
Top