I know that the service will need 2 parallel 500cmil runs and the grounding conductor should be a 1/0 copper. I was told by 2 different inspectors 2 different answers. First one says that 2 - 1/2" ground rods cadwelded is enough. The second says 3 - 1/2" rods. Which is right?