Today's game:
Property: 2 apartments over 1 deli.
Issue: Smoked service
What we know:
150A 1? OH service, AL conductors
Insulation missing in two locations...at POA and in Main before CB.
Deli Meter melted jaw
Deli is OPEN 7 days a week....7 refrigeration/freeze units
Typical conditions of neutral/ground bonding beyond meter; doubled up wires on CBs, etc.
Overall basement conditions: FAIR
The pictures [apologizes for dismal quality]:
Through is behind 2 apt meters, condition of wiring: UNKNOWN
Insulation missing before main
...
Meter pan condition: Replace as per POCO
........
Exterior
Not shown:
OH lateral comes down between 2 windows,
less than 3' to windows
triplex cable
At the POA splice, insulation is missing ~ if this is the same phase as the interior missing insulation: UNKNOWN.
******************
Proposed:
Remove and replace existing AL conductors TEMPORARILY [*see below]
Install new 200A Meter Main Stack [Square D MP64200] and OH service.
Install new panels for:
- apartments [@60A each], appx 14 ckts total - all 20A SP
- deli [@150A], appx 17 15A SP; 7 20A SP; 2 20 2P; 1 60A 2P
- house panel [@60A] ?
- replace H20 ground
- install ground rods [none exist]
If the circuitry will allow for separating of common areas from tenent areas: UNKNOWN.
***********
Concerns:
* Deli is open 7 days a week, multiple refrig/freeze unit - loss of revenue and inventory.
POCO will kill power to entire property if job is delayed/not started in a timely fashion...aka, ASAP, PDQ, NOW, TODAY
************
I'm working my magic now...what say you?
Property: 2 apartments over 1 deli.
Issue: Smoked service
What we know:
150A 1? OH service, AL conductors
Insulation missing in two locations...at POA and in Main before CB.
Deli Meter melted jaw
Deli is OPEN 7 days a week....7 refrigeration/freeze units
Typical conditions of neutral/ground bonding beyond meter; doubled up wires on CBs, etc.
Overall basement conditions: FAIR
The pictures [apologizes for dismal quality]:
Through is behind 2 apt meters, condition of wiring: UNKNOWN
Insulation missing before main
...
Meter pan condition: Replace as per POCO
........
Exterior
Not shown:
OH lateral comes down between 2 windows,
less than 3' to windows
triplex cable
At the POA splice, insulation is missing ~ if this is the same phase as the interior missing insulation: UNKNOWN.
******************
Proposed:
Remove and replace existing AL conductors TEMPORARILY [*see below]
Install new 200A Meter Main Stack [Square D MP64200] and OH service.
Install new panels for:
- apartments [@60A each], appx 14 ckts total - all 20A SP
- deli [@150A], appx 17 15A SP; 7 20A SP; 2 20 2P; 1 60A 2P
- house panel [@60A] ?
- replace H20 ground
- install ground rods [none exist]
If the circuitry will allow for separating of common areas from tenent areas: UNKNOWN.
***********
Concerns:
* Deli is open 7 days a week, multiple refrig/freeze unit - loss of revenue and inventory.
POCO will kill power to entire property if job is delayed/not started in a timely fashion...aka, ASAP, PDQ, NOW, TODAY
************
I'm working my magic now...what say you?