bjp_ne_elec
Senior Member
- Location
- Southern NH
So far I've stuck to doing jobs in NH but most recently have been doing work with a GC who does some work in MA. Are there any major differences in MA Code vs. NEC, and if so, are they mainly in the area of grounding?
Thanks
Thanks