There have been threads about bidding houses per sq foot, and per linear foot of NM-B.
I have almost replied to 3 or 4 threads about bidding residential, so thought I'd just post one here;
When I did residential, the EC bid per opening.
Tougher devices were double; chime kit, smoke detector, disposal, cut-ins, can (RI can extra), high entry lights, tc.
The EC would add a surcharge to builders that used the house for storage and full of scrap. He cut the rate for builders who had the house ready, empty, and swept before we arrived.
What are you bidding per opening? What are you doing about difficult openings?
I have almost replied to 3 or 4 threads about bidding residential, so thought I'd just post one here;
When I did residential, the EC bid per opening.
Tougher devices were double; chime kit, smoke detector, disposal, cut-ins, can (RI can extra), high entry lights, tc.
The EC would add a surcharge to builders that used the house for storage and full of scrap. He cut the rate for builders who had the house ready, empty, and swept before we arrived.
What are you bidding per opening? What are you doing about difficult openings?
Last edited: