AC\DC
Senior Member
- Location
- Florence,Oregon,Lane
- Occupation
- EC
I have a general contractor approached me several months ago about a project. He’s out of state and he couldn’t find anyone local EC.? I felt bad for him, I was just gonna do a time and material and I gave him a decent rate. In my contract I stated rewiring the house and The end date was July 1 for the contract. I got my inspection it was approved. After that he adds Low voltage on me, I didn’t really care.
Now he asked me to go to the local security system Contractor, buy any materials that the gentleman needs and install it and the security contractor hook up with the end system. he stated so He save some money. Now that kind of got to me I’m not his little mole, and that wasn’t in my contract. I stated rewiring and I base that on the drawings that I was submitted has no low-voltage that was added later and has no security.
I’m thinking after I give him my bill and he pays me to tell him exactly how I feel and maybe not come back and do the finish work I don’t.
If the spelling is bad and grammar sorry I’m working on that job as we speak
Now he asked me to go to the local security system Contractor, buy any materials that the gentleman needs and install it and the security contractor hook up with the end system. he stated so He save some money. Now that kind of got to me I’m not his little mole, and that wasn’t in my contract. I stated rewiring and I base that on the drawings that I was submitted has no low-voltage that was added later and has no security.
I’m thinking after I give him my bill and he pays me to tell him exactly how I feel and maybe not come back and do the finish work I don’t.
If the spelling is bad and grammar sorry I’m working on that job as we speak