Would you consider code-compliant (as I do consider to be code-compliant) this arrangement to meet 250.92NEC2008:
Bond the service neutral conducter to metal pipe riser near point of attachment with short aluminum conductor with split bolt and pipe grounding clamp.
Install a service head and use another clamp to anchor drop to riser thus removing the threaded rod from the interior of pipe riser which is currently the condition.
Attached please find photo of this.
I'm making this electrical inspection and both HO and EC want to control costs. To remove existing riser and make it continuous into meter enclosure is not what they want.
Thanks
Bond the service neutral conducter to metal pipe riser near point of attachment with short aluminum conductor with split bolt and pipe grounding clamp.
Install a service head and use another clamp to anchor drop to riser thus removing the threaded rod from the interior of pipe riser which is currently the condition.
Attached please find photo of this.
I'm making this electrical inspection and both HO and EC want to control costs. To remove existing riser and make it continuous into meter enclosure is not what they want.
Thanks