We are bidding for a project. In this project, there are too much conduit and cable tray have to be hanged and braced. I know the calculation procedure is very complex, and now it's impossible to calculate the exact amount and configuration in each point. So if you are in the same situation, how to determine the amount of hangers and seismic bracing in short time?
And I know in NFPA 13, there is the requirement of calculation of seismic bracing for sprinkle system. But for electrical, which standard or code specify the requiremnet of calculation of seismic bracing?
Thank you in advance.
And I know in NFPA 13, there is the requirement of calculation of seismic bracing for sprinkle system. But for electrical, which standard or code specify the requiremnet of calculation of seismic bracing?
Thank you in advance.