I hope someone could help me. I am installing a XFMR 480v to 120/208. and install a pnl for temp power when a contractor sets up a job trailler. All I have is some 1/0 that is ran from a utility meter to a disc. under a road and stub out the othe side wich is were I would like to set a XFMR and a PNL with 120? any one have a sugjestion what KVA I should have?