Just fishin' for some opinions.... I already have 3 plans - just looking to see if there are any other ideas.
Looked at a job to remove all OCP and branch disconnecting means from tenant units of a multi-unit building under single management and single metering.
4 units shown also have circuits for eachother and other units not shown. The 3 verticaly are a common wall fed from two feeders (1 1/4 EMT) from the main in the "Trades Entrance" below where I plan to move all of the OCP. Most loads are 40a heat, and a number of GP branch circuits.... All conduits are within the finished walls... Oh - the area to the right is a barely acessible light well. And I guess we'll call panel on the lowest floor 1, middle floor 2A and 2B, top #3...
Looked at a job to remove all OCP and branch disconnecting means from tenant units of a multi-unit building under single management and single metering.
4 units shown also have circuits for eachother and other units not shown. The 3 verticaly are a common wall fed from two feeders (1 1/4 EMT) from the main in the "Trades Entrance" below where I plan to move all of the OCP. Most loads are 40a heat, and a number of GP branch circuits.... All conduits are within the finished walls... Oh - the area to the right is a barely acessible light well. And I guess we'll call panel on the lowest floor 1, middle floor 2A and 2B, top #3...